The central weeks of April were characterized by snowfalls even at very low altitudes (below 900m), and by anomalous cold, causing the closure of open trails, and the impossibility of working, given the presence of snow in all areas. Snow which then melted quickly only at the lowest altitudes, allowing us to resume work, albeit with a thousand difficulties.
FAI ZONE
- preparation of the arrival area, with milling of the drop landing lanyards
- 400 meter rebuild of Peter Pan. (total rebuild underway)
- cleaning and maintenance of other paths
- completion of works in view of the opening
MOLVENO AREA
- rebuilding of Big Hero segments
- cleaning and post-weekend arrangements
Construction site setups with material dislocation for the start of work in the Andalo Zone
Continuation with the cleaning activities of the natural trails as the snow level rises
Continuation with the control, arrangement and installation of signs