We started in mid-March with the cleaning and checking of all the routes below 1500 m altitude, both bike parks and shared -natural ones, then we concentrated on the FAI ZONE and MOLVENO ZONE.
We currently work with 4 teams of 3 or 4 people, who are engaged in:
- re-build of Peter Pan (FAI ZONE)
- preparation of the arrival area (FAI ZONE), assembly of the drop/road gap and milling of the landing line
- manual trail care interventions in FAI ZONE, specifically the photos refer to a "creative" tree removal
- reshape intervention on the Matrix. and forest improvement
- re-build intervention on the Blade Runner, following changes in water management
We then proceeded to:
- re-build Big Hero
- trailcare on natural trails
- signage